控件[tem_25_34]渲染出错,Source:未将对象引用设置到对象的实例。

ZGS13-H American pre-installed box-type substation

Back to product >>
Cooperation Consulting >>

Product Details

image.png

Overview

This product is to absorb the latest foreign advanced technology, combined with the actual situation of domestic research and development, the whole product has the characteristics of small size, easy installation and maintenance, low noise, low loss, anti-theft, overload capacity, full protection. Suitable for new residential areas, green belts, parks, station hotels, construction sites, airports and other places.

ZGS13-H series American pre-installed box-type substation is suitable for 10kV ring network power supply, dual power supply or terminal power supply system, as substation, metering, compensation control and protection devices.

This product meets the following standards: GB/T17467-1998 "high voltage and low voltage prefabricated substation", DL/T537-93 "6-35kV box type substation ordering technical conditions"

Model Meaning

image.png

functions and characteristics

Fully insulated, fully sealed, free of less maintenance, reliable to ensure personal safety;

The structure is compact, the volume is only 1/3-1/5 of the European transformer with the same capacity, and the height is low;

The sub-box structure can be used to avoid the pollution of the oil in the transformer oil tank;

The high-voltage side adopts double fuse full-range protection, which greatly reduces the cost:

◇ Both ring network and terminal can be used. The cable head can be plugged and unplugged in emergency at 200A load current;

The box body adopts honeycomb double sandwich composite board, which has the function of temperature insulation and heat dissipation;

The low-voltage side is equipped with an electronic phase loss protector, which can quickly break the main switch when abnormal voltage occurs in the system;

◇ High-pressure side oil-immersed load switch or SF6 load switch can be upgraded electrically, laying the foundation for realizing distribution network automation.

Oil-immersed S9 or S11 series transformers with better performance are adopted.

normal conditions of use

The altitude shall not exceed 2000m;

◇ Ambient temperature:-35 ℃ ~ +40 ℃;

Relative humidity: the daily average value is not more than 95%, the monthly average value is not more than 90%;

Installation place: no fire, explosion hazard, chemical corrosive gas and well ventilated place, the ground angle is not more than 3 °.

load switch

Technical Parameters of Pre-installed Substation

No. 1

Name

Unit

technical parameters

1

Rated voltage

kV

10/0.4 (high pressure/low pressure)

2

maximum working voltage

kV

12 (high pressure side)

3

Rated frequency

Hz

50

4

Rated capacity

kVA

50-1600

5

1 minute power frequency withstand voltage

kV

35

6

Lightning impulse voltage

kV

75

7

cooling method

oil-immersed self-cooling

8

Breaking current of high-voltage backup fuse

kA

50

9

plug-in fuse breaking current

kA

2.5

10

ambient temperature

-35-+40

11

coil

k

65

12

no-load voltage regulation

± 5% or ± 2x2.5%

13

noise level

dB

50

14

protection level

IP43

Transformer

The new S9 series transformer body is selected, with low loss, good overload capacity and strong short-circuit resistance. All fasteners are treated with anti-loosening treatment and no hanging core. S10 series and S11 series transformers with better performance can also be selected.

capacity kVA

voltage kV

Join Group Label

No-load current%

No-load current%

Impedance Voltage%

weak

S10

S11 I

high pressure

low pressure

S9

S10

S11

S9

S9

S11

50

2.0

1.9

0.75

0.17

0.15

0.12

0.87

0.83

0.87

63

1.9

1.8

0.7

0.2

0.18

0.14

1.04

0.99

1.04

80

1.9

1.7

0.7

0.25

0.22

0.175

1.25

1.2

1.25

100

1.8

1.55

0.65

0.29

0.26

0.2

1.5

1.42

1.5

125

1.7

1.45

0.65

0.34

0.3

0.235

4.0

1.8

1.72

1.8

160

1.6

1.3

0.6

0.4

0.36

0.27

2.2

2.12

2.2

200

10+5%

Dyn11

1.5

1.2

0.55

0.48

0.43

0.33

2.6

2.5

2.6

250

or

0.4

or

1.4

1.1

0.5

0.56

0.5

0.39

3.05

2.9

3.05

315

±2 x 2.5%

YynO

1.4

1.0

0.45

0.67

0.29

0.465

3.65

3.45

3.65

400

1.3

1.0

0.4

0.8

0.71

0.56

4.3

4.15

4.3

500

1.2

1.0

0.4

0.96

0.85

0.67

5.15

4.82

5.15

630

1.1

0.8

0.4

1.2

1.6

0.81

6.2

5.86

6.2

800

1.0

0.7

0.35

1.4

1.23

0.98

7.5

7.2

7.5

1000

1.0

0.6

0.3

1.7

1.5

1.15

4.5

10.3

9.8

10.3

1250

0.9

0.6

0.27

1.95

1.72

1.36

12.0

12.2

12.0

Load Switch

load switch is oil-immersed, three-phase linkage switch and spring operating mechanism. It can be operated with load opening and closing. Its opening and closing speed has nothing to do with the size of the operating force. The types are two-station, four-station D-type, four-station V-type, etc.

Serial Number

Name

Unit

Four-station ring network load switch

two-position load switch

1

Rated current

A

630

315

2

Rated short-circuit closing current

kA

31.5

31.5

3

Rated short-time withstand current

kA

12.5

12.5

4

Rated short-time withstand time

s

2

2

5

mechanical life

times

2000

2000

6

Lightning impulse tolerance

Interphase to ground

kV

75

75

7

voltage peak full wave

isolation fracture

kV

85

85

8

1min power frequency withstand voltage power receiving

Interphase to ground

kV

42

42

9

pressure

isolation fracture

kV

48

48

10

Rated peak withstand current

kA

31.5

31.5

fuse (recommendation table for selection and configuration of oil-immersed fuse of our company)

American box transformer is provided with full-range protection by backup protection fuse and plug-in fuse in series, which is simple in principle, economical and reliable. The backup protection fuse is an oil-immersed high-voltage current limiting fuse with large breaking capacity and only operates when the transformer fails. The plug-in fuse is equipped with double-sensitive fuse, which can provide double protection of current and temperature. After the double-sensitive fuse is blown, the fuse core can be easily replaced on site.

Serial Number

Three-phase transformer capacity (kVA)

transformer primary voltage (10kV)

XRNT rated current (A)

PRNT1 overload protection rated current (A)

1

30

10

6

2

50

16

8

3

80

16

10

4

100

20

15

5

125

25

15

6

160

31.5

25

7

200

40

25

8

250

50

40

9

315

63

40

10

400

63

40

11

500

80

50

12

630

100

50, 65

13

800

125

65

14

1250

160

100

15

1600

200

140

box transformer structure

The product box structure is composed of three parts: high pressure interval, low pressure interval and fuel tank interval. The high-voltage interval includes high-voltage cable accessories, load switch, no-load tap-changer, plug-in fuse, pressure release valve, oil level gauge, oil temperature meter and oil drain valve. The LV interval includes LV bushings, LV meters, circuit breakers, and capacitance compensation. The tank interval includes transformer winding and iron core, radiator, high-voltage load switch and fuse. The tank transformer structure can be designed as "product" type or "target" type as shown in the following figure according to the requirements of the scheme.

image.png

Operating Instructions

load switch:

American box transformer has three types of two-station, four-station T-type and four-station V-type according to the different functions it realizes, and one of them can be selected,

three types are as follows:

Refer to Figure 2 for the four-station V-type load switch. The structure of the power plate is V-type, as shown in the black part of the figure. In the figure, "I and itn are the power supply incoming and outgoing lines of the ring network, and" R "is the meridian

backup fuse and insert fuse to connect high voltage incoming line of transformer. The ring network load switch switches the network with load. Four working states of the load switch:

1. In the "I-II-T" position, the "I" and "II" networks are connected, and the transformer has electricity; (The substation acts as a ring network)

2, B I -T "position," I "network and transformer communication; (substation terminal)

3, "II -T" position, "II" network and transformer communication; (substation terminal)

4, "O" position, "I, II" network and transformer are disconnected; (all without electricity)

Insert the rotating shaft of the load switch with a special operating handle and rotate it clockwise or counterclockwise for about 130 °. The power plate will rotate one gear for each operation of the load switch. Switch operation example: power supply from power supply ° I "is changed to power supply" II.

Insert the special operating handle into the switch shaft;

, and the V-shaped blade of the switch is in the "I-II-T" position;

clockwise one more time, and the "V" blade is between "II -T" to power the power supply "II"; operation is complete.

operation method two:

a. Insert the special operating handle into the switch shaft;

B. Turn the switch counterclockwise once, and the switch "V" blade is in the "O" position:

c. Rotate again in the counterclockwise direction. At this time, the "V" blade is between "II" to supply power "II"; operation is complete.

the above two methods can be used to switch from the power supply "I" to the power supply 11II ", the second method is safer and more reasonable. After the power supply "I" is cut off, it will not be powered again, and if the power supply "II" fails, it will not cause the failure. However, when the first method is adopted, dual power supply will occur. When the power supply "I" is converted to the power supply "II", if the power supply phase is different, the fault will be caused.image.png

Four-station ring network type load switch (T type) The working principle of four-station "T" type load switch is shown in Figure 3, and the principle operation is the same as that of "V" type.

Two-station terminal load switch

The structure diagram is shown in Fig. 4, in which T' is connected with the high-voltage incoming terminal. When the user is operating, insert the special operating handle into the load switch shaft, rotate "90" counterclockwise, and the load switch turns to the "off" position. The terminal load switch only cuts off the transformer branch in the terminal power supply mode, or works when replacing the fuse core of the plug-in fuse. Therefore, the terminal load switch only divides and combines two positions, and due to its small size, the operating force is also small, the operation is very convenient. In order to reduce the oil pollution in the oil tank, it is recommended that the user disconnect the low-voltage main switch or the outgoing switch before operating the load switch to cut off the low-voltage side load.

cable head

a and 12kV pre-installed substations are cables, and the high-voltage power supply is led out of the oil tank by epoxy cast insulating sleeve. In order to facilitate the manufacturer's test and user acceptance test, the insulating sleeve itself has the ability to withstand power frequency withstand voltage and lightning impulse withstand voltage.

B. Select elbow-type or T-type cable head matching with the cable section, clean its inner and outer surfaces and the surface of the insulating sleeve with anhydrous ethanol, coat a little 7501 vacuum silicone grease on the surface of the sleeve, and install it according to the special installation specifications of the cable work area. See the accompanying instructions for the installation of the cable head.

Plug-in Fuse Replacement

plug-in fuse is a component that can replace the flame core externally. When replacing, first pull the button of the pressure release valve of the upper fuel tank to balance the pressure inside and outside the fuel tank. In order to ensure the safety of operators and equipment, the plug-in fuse is plugged and unplugged when it is not loaded, so first disconnect the low-voltage switch to cut off all loads on the low-voltage side, then switch the load switch to the power supply and transformer disconnection position with the operating handle, then loosen the handle on the fuse holder with the operating handle, and then rotate it by about 90 degrees to eliminate the adhesion between the sealing gasket and the outer wall, pull out the melt of the fuse 70-80mm obliquely upward, and stay for a few seconds. After the oil on the melt flows away, pull out the melt to prevent the oil from dripping on other components outside the oil tank. Wipe the surface of the melt with clean cotton cloth, and then replace the melting core. When replacing, be sure to pay attention to the parameters marked on the core, different parameters can not be substituted. The replacement procedure is shown in the figure. After replacing the fuse core, insert the melt into the fuse support by force. When rotating the handle on the melt to the locking position, make sure that the gasket is close to the fuse support and the handle is buckled on the boss to ensure that the substation is fully sealed without moisture. Then close the high-voltage load switch and the low-voltage switch again, and then the power supply can be restored.

Because the substation is a three-phase system, whether it is a backup protection fuse or a plug-in fuse, when a phase melt is blown, the general three-phase melt should be replaced, unless it can be determined that only one phase melt has passed the fault current.

plug-in fuse replacement steps

h LV main switch opening;

2. Opening of high voltage load switch;

3. Pull the pressure release valve ring to release the pressure:

4. Hook the operation hole and rotate it upward by 90 degrees;

5, up 100mm, stop, and then pull out all;

6, with a clean cotton cloth dry;

7. Replace the molten core as shown in the following figure:

8. Quickly insert the replaced molten core into the original hole and buckle it.

image.png

transportation, installation and maintenance

transportation

The factory substation shall be filled with 25#(or 45#) transformer oil as indicated by the oil level gauge in the oil tank. During transportation and loading and unloading, it is not allowed to invert and overturn, not to hit parts, and not to vibrate strongly.

Special attention shall be paid to the lifting hook of the substation during hoisting and displacement. The lifting hook shall be hooked on the hook of the oil tank and shall be lifted slowly to prevent the wire rope from damaging the paint on the surface of the substation and even causing the center of gravity of the whole substation to shift, tilt and fall.

Installation

When the substation is installed on site, attention should be paid to the protection of the paint on the surface of the cabinet. Collision, cracks, etc. of the barometer, oil level gauge, thermometer, handle of plug-in fuse and insulating sleeve elements are not allowed, and the screws are not loose.

Clean the dust and dirt on the outside of the substation, inside the cabinet door and the surface of the insulation sleeve.

Check whether the nameplate data and product certificate of the substation are consistent with the order form, and check whether the documents and spare parts are omitted according to the packing list.

Civil drawing of cable inlet and outlet lines of substation.

Maintenance

The factory products have been strictly assembled and adjusted, and do not need to be disassembled again during installation, so as not to affect performance. Maintenance is limited to the following situations:

conduct transformer oil sampling analysis once a year;

the oil level is found to be reduced, it should be replenished in time, and the oil grade is the same as the oil in the box:

After the fuse is blown, the cause should be found out. When replacing the fuse core, it should be noted that its specifications and models should be the same as the original specifications and models.

Test before acceptance and commissioning

After unpacking, check whether the documents and accessories are complete;

Whether the oil level indicated by the oil level gauge meets the product regulations; Whether the tap changer is in the correct gear position;

◇ Operate the load switch clockwise and counterclockwise for four times each, and there shall be no abnormal phenomena such as "refusing to divide and refuse to close;

◇ Measurement of DC resistance on high and low voltage side; ◇ Measurement of transformer transformation ratio;

: Insulation resistance measurement and power frequency withstand voltage test (according to the factory 80%).

Factory data

The following documents and accessories shall be provided when the manufacturer supplies the goods.

◇ Shipping List ◇ Product Certificate and Factory Test Report

◇ Instructions for use ◇ Relevant electrical drawings

◇ Main component specification ◇ Cabinet door key, operating handle and spare parts specified in the contract sheet.

Ordering Instructions

The following information shall be provided to our company when counting goods:

Product model and quantity;

Transformer model and capacity:

Transformer oil (25#,45#, high ignition point oil);

◇ High and low voltage side primary wiring scheme and main component parameters;

◇ High-voltage incoming cable section; ◇ Required spare parts.

Civil Drawing of Cable Inlet and Outlet Lines of Substation (ZGS13-H) :

image.png

Technical requirements:

Refer to the actual size of the combined transformer for relevant dimensions: the concrete foundation shall have a flat surface, and the combined transformer station shall be fixed on the foundation by pressing plate; the type of grounding bar and cable fixing bracket can be determined according to the actual situation; the cable fixing frame and grounding bar shall be embedded; the position of the inlet and outlet cable holes shall be determined according to the specific situation; after the installation of the combined transformer, the front of the switch must have a gap of not less than 1.5m to facilitate operation; the grounding grid can be made of 12 galvanized round steel or 40 × 4 galvanized flat copper, and the grounding resistance shall meet the requirements of the power department.

image.png

Related Products

PRODUCTS

Product consulting

Consulting products: *

Name: *

E-mail: *

Contact number: *

WeChat: *

Notes: *

控件[tem_25_34]渲染出错,Source:未将对象引用设置到对象的实例。