控件[tem_25_34]渲染出错,Source:未将对象引用设置到对象的实例。

Stainless steel explosion-proof type-Oil Immersed Transformer Breather Silicon Gel Air Purifier Device. Transformer Tank Moisture Absorber

Back to product >>
Cooperation Consulting >>

Product Details

Transformer Accessories
oil immersed power transformer breather
Transformer spare parts 




The ordinary type transformer breather

This type oisture absorber is a special air purification device for oil immersed transformer. It is installed on the air
inlet of the oil conservator to purify the air entering the oil conservator through the moisture absorber. It can
effectively remove impurities and water in the air to keep the transformer oil clean and insulation strength. In
addition, the product also uses a new type of thermoplastic engineering plastics, polyamide 66 injection molding.
Its advantages are: high mechanical strength, good chemical corrosion resistance.
Double transformer breather
This is a new type of purification device used for transformer oil conservator. The product features: 1. The air
purification air is lengthened, the filtration time is prolonged, and the effect is obvious, 30% higher than that of
conventional moisture absorber. 2. The purification room adopts full transparent glass and blue discolored silica
gel, and the bottom adopts labyrinth air intake channel. After the oil cup is filled with oil, when the transformer is
operating, you can directly see the exhalation and inhalation of the moisture absorber, and you can observe the
position of the oil seal during the operation. The well can observe the internal state of the transformer from the oil
cup breath, effectively prevent the dust and water of the air from entering the transformer oil, and ensure the
absolute green strength of the transformer oil.

Stainless steel explosion-proof type


Our Services

1.

Pre sale service

a.

make technical solution

b.

send quotation, technical data sheet and drawing

c.

prepare power transmission plan, testing plan,and shipment plan

2.

In sale service

a.

supervise the manufacturing schedule totally in accordance with the plan

b.

send photos to customer during every manufacturing process(hold point)

c.

inform the customer one week before testinng.

3.

After sale service

a.

installation and commissioning, training the workers

b.

quick response within 12 hours any time

c.     

provide 12 months gurantee period normally.                                                           


FAQ

1. Q:

What is your delivery time ?

A: 

Depend on the type of transformer.

2. Q:

What is your payment term?

A: 

30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.

3. Q:

What kind of starndard you follow?

A: 

IEC, ANSI, CSA, GB, etc

4. Q:

What kind of supporting documentation you can provide normally

A: 

Quotation,outline drawing,manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list,etc

5. Q:

What is your normal wanrranty period?

A: 

12 months after transformer operation.

6. Q:

Can u do installation and commissioningin user's site?

A: 

Yes, we can send our installation team to user's country for service.

7. Q:

Do you have any experience in this kind of transformer?

A: 

Yes, we can provide reference list for check.

8. Q:

Are you manufacturer or trading company?

A: 

Manufacturer with own import & export company.

Our advantages:

Quality Assurance

--From the very beginning, VILLE ensures quality in every step to achieve the best quality.

 Experience Sharing

--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.

 Global Service

--Wherever you are, VILLE global network will support and provide you with value.

 Quick Response

--In response to your needs without delay, VILLE  knows the value of your time.

 

Thanks for choosing VILLE as your reliable partner and please trust both
of us will create a brilliant future!

Related Products

PRODUCTS

Product consulting

Consulting products: *

Name: *

E-mail: *

Contact number: *

WeChat: *

Notes: *

控件[tem_25_34]渲染出错,Source:未将对象引用设置到对象的实例。